- Home
- Departments
- Public Works
- Engineering
- Stormwater Program
Town of Falmouth Stormwater Program
Town of Falmouth
National Pollutant Discharge Elimination System (NPDES) Documents
Appendices
Appendix A - Notice of Intent and Authorization to Discharge
Appendix B - Stormwater Bylaws and Regulations
Appendix C - Stormwater System Mapping
Appendix D - Regulatory Assessments
Appendix E - Inventory and Ranking of Town-Owned Property
Appendix F - Street Sweeping Optimization Plan
Appendix G - Catch Basin Optimization Plan
Appendix H - List of Stormwater BMPs and Inspection Records
Appendix I - Annual Reports
Annual Reports
Year 1 Annual Report 5/1/18-6/30/19
Year 2 Annual Report 7/1/19-6/30/20
BMP Pollutant Reduction Credits 4-2021
Year 3 Annual Report 7/1/20-6/30/21
Year 4 Annual Report 7/1/21-6/30/22
Falmouth Phosphorus Source Identification Report: Ashumet Pond June 30, 2022
Falmouth Outfall Screening
Superceded Stormwater Management Program (SWMP) Plans
2019 Original Report
2021 Revised Report
Illicit Discharge Detection and Elimination (IDDE) Plan
Appendix A: Stormwater System Mapping
Appendix B: SSO Inventory
Appendix C: IDDE Outfall Classification/Ranking and Vulnerability Assessment
Appendix D: SOPs for Dry Weather Outfall Investigation/Sampling
Appendix E: SOP for Illicit Discharge Source Investigation
Appendix F: SOP for Dry Weather Key Junction Investigation/Sampling
Appendix G: SOP for Wet Weather Outfall Sampling
Appendix H: Field Evaluation Records
Appendix I: IDDE Employee Training Records (See Below)
Training
Appendix I
08-06-20_MS4_IDDE_SWPPP_SPCC
04-27-21_MS4_IDDE_SWPPP_SPCC
04-27-2021 Presentation
06-01-22_MS4_IDDE_SWPPP_SPCC
06-01-2022 Presentation
Operations and Maintenance Plan
Appendix A: Revision Log
Appendix B: Emergency Contact List
Appendix C: Spill Response Information
Appendix D: Spill Reporting Log
Appendix E: Employee Training Log (See Below)
Appendix F: SWPPP Inspection Records
Appendix G: Site Inspection Form (See Below)
Appendix H: Testing and Inspection Records (See Below)
Appendix I: Site Inspection Form
Training
Appendix E
08-06-20_MS4_IDDE_SWPPP_SPCC
04-27-21_MS4_IDDE_SWPPP_SPCC
04-27-21 Presentation
Inspections
Please direct any questions, comments, or concerns regarding the NPDES program to the Engineering Division email at Engineering or call 508-457-2543.
PHASE II STORMWATER MANAGEMENT PROGRAM
Stormwater discharges in the Town of Falmouth are regulated by the U.S. Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Phase II Stormwater Permit Program. Under this program, Falmouth was required to obtain NPDES permit coverage under the 2016 "General Permit for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems (MS4s)" for its stormwater discharges. This permit program was created with the intention of improving the quality of the nation’s waterways by reducing pollutant loads associated with stormwater runoff. Under this permit, Falmouth is required to develop and implement a Notice of Intent (NOI) and Stormwater Management Program (SWMP), which identifies Best Management Practices (BMPs) the Town will implement to address the following six "minimum control measures (MCMs)":
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention/Good Housekeeping for Municipal Operations
Falmouth submitted its Notice of Intent (NOI) to EPA and MassDEP in September 2018 to meet permit requirements which summarized Falmouth’s proposed SWMP to comply with the permit, which is detailed further in Falmouth’s written SWMP Plan originally prepared in June 2019 with updates ongoing. Falmouth submits Annual Reports to EPA and MassDEP by September 30th of each year summarizing the progress of its SWMP. The NOI and Annual reports are available on EPA’s website.
Click the links below to learn more about stormwater management in Falmouth.
- What is stormwater?
- Resources for Residents.
- Resources for Commercial and Businesses.
- Resources for Developers and Site Operators.
- Resources for Industrial Facilities
- Falmouth Stormwater Materials
Other Resources
-
James E. McLoughlin, PE
Town EngineerPhone: 508-457-2543, ext. 3104
-
Engineering Division
Physical Address
416 Gifford Street
Falmouth, MA 02540
Phone 508-457-2543
Hours
Monday through Friday
7:00 a.m. - 3:30 p.m.