Appendices - 2013 CWMP
- Appendices for Chapter 1
- 1-1: Article 17 (PDF)
- 1-2: Vision and Strategies Statement (PDF)
- 1-3: Plan of Study (PDF)
- 1-4: DEIR Comments Letters and Response Memo
- 1-5: WWTF Discharge Permit and Settlement Agreement (PDF)
- Appendices for Chapter 2
- 2-1: Summary of 2 Past WWFP Projects (PDF)
- 2-2: Summary of MEPA Evaluations and TMDL Dev (PDF)
- 2-3: Summary of Needs Assessment Report (PDF)
- 2-4: Copy of Needs Assessment Report, October 2007 (PDF)
- 2-5: Summary of Alternatives Screening Alternatives Analysis Report (PDF)
- 2-6: Copy of Alternatives Screening Analysis Report, November 2007 (PDF)
- 2-7: Copy of ENF Document (PDF)
- 2-8: Regional WW and Nutrient Management Efforts (PDF)
- Appendices for Chapter 3
- 3-1: Shellfish Demonstration Project Items (PDF)
- 3-2: Summary of Inlet Opening Evaluations (PDF)
- 3-3: Inlet Opening Evaluations TM 3-2008 (PDF)
- 3-4: BP-1 Tech Memo (PDF)
- 3-5: Eco-Toilet Demonstration Project items
- 3-5: Envirolet SG Instructions 7MINS11B November 4, 2011 (PDF)
- 3-5: Final Installation Instructions - Dubbletten 12 (PDF)
- 3-5: Part 1 (PDF)
- 3-5: Phoenix Residential (PDF)
- 3-6: PRB Demonstration Project Items (PDF)
- 3-7: Stormwater Demonstration Project Items (PDF)
- 3-8: Fertilizer Management Items (PDF)
- 3-9: Not Used (PDF)
- 3-10: JBSCE Articles (PDF)
- 3-11: Cost Summary for Outfall at Nobska Point (PDF)
- 3-12: Falmouth Outfall Invitation and Agenda (PDF)
- 3-13: Not Used (PDF)
- 3-14: Watershed Mods and Increased Attenuation (PDF)
- Appendices for Chapter 4
- 4-1: Excerpt on Feasible Technologies (PDF)
- 4-2: Excerpts from ASAR Initial Site Evaluations (PDF)
- 4-3: TM-2
- 4-4: Sludge Management Alternatives (PDF)
- 4-5: Evaluation Summary for 1A, 2A, and 3A (PDF)
- 4-6: GW Modeling Guidance Document 6-09 (PDF)
- 4-7: Well Injection Summary (PDF)
- 4-8: TOC Removal Technologies (PDF)
- 4-9: TM-1 (PDF)
- 4-10: TM-3 (PDF)
- 4-11: TM-4 (PDF)
- 4-12: TM-5 (PDF)
- 4-13: TM-6
- 4-14: Newsletters, Fact Sheets, Findings (PDF)
- 4-15: TM-7
- 4-15: Flysheet (PDF)
- 4-15: Revised Figure June 4, 2012 (PDF)
- 4-15: TM-7 Appendix A and B (PDF)
- 4-15: TM-7 Figures (PDF)
- 4-15: TM-7 Text and Tables (PDF)
- 4-15: TM-7 (PDF)
- 4-16: Not Used (PDF)
- 4-17: Costs for Scenario 1E (PDF)
- 4-18: Not Used (PDF)
- 4-19: Tech Memo 8 (PDF)
- 4-20: Tech Memo 9 (PDF)
- 4-21: Site 7 Archaeological Report (PDF)
- 4-22: Evaluation and Costs for Little Pond Area (PDF)
- 4-23: Tech Memo S-0 (PDF)
- 4-24: Tech Memo S-1 (PDF)
- 4-25: Tech Memo S-2 (PDF)
- 4-26: Tech Memo S-3 (PDF)
- 4-27: Tech Memo S-4 (PDF)
- 4-28: Tech Memo PS-1 (PDF)
- 4-29: Tech Memo WW-1 (PDF)
- 4-30: Tech Memo TW-1 (PDF)
- 4-31: Preliminary Design Flow for LPSSA (PDF)
- 4-32: Technical Memorandum 12 (PDF)
- 4-33: Ecologic Report August 8: 2013 (PDF)
- 4-34: Not Used (PDF)
- 4-35: SMAST Evaluation from Site 7 (PDF)
- 4-36: Stakeholder Meeting Items (PDF)
- Appendices for Chapter 6 (PDF)
- Appendices for Chapter 7
- Appendices for Chapter 8 (PDF)