Tapping Charges 6" Tap
|
$3,800
|
|
January 1, 2023
|
Tapping Charges 8" Tap
|
$3,800
|
|
January 1, 2023 |
Tapping Charges Additional
|
$45 Per Foot for Service Over 40 Feet
|
|
January 1, 2023 |
Service Installation Fees 1" Tap and Service
|
$2,800
|
|
January 1, 2023 |
Service Installation Fees 2" Tap and Service
|
$3,200
|
|
January 1, 2023 |
Service Installation Fee Add
|
$5 Per Feet for Service Over 60 Feet
|
|
July 2, 2008
|
Service Installation Fee Add
|
$530 for 1 Inch Meter Pit
|
|
July 2, 2008
|
Service Installation Fee Add
|
$1,100 for 2 Inch Meter Pit
|
|
July 2, 2008
|
Replacement of Broken Curb Stop |
$2,000 |
|
January 1, 2023 |
Closing/Transfer Fee
|
$70 Per Reading
|
|
January 1, 2023 |
Meter Fees 5/8" Meter
|
$550
|
Applicable to all Metered Services
|
January 1, 2023 |
Meter Fees 1" Meter |
$720 |
|
January 1, 2023 |
Costs for all others to be determined at the time of installation
|
|
Cost Will be Meter, Meter Valve, Meter Tail, Price Plus $65 for Labor and Administrative Fees
|
January 1, 2023 |
Fire Hydrant Use (temporary)
|
See Below
|
For Filling Pools, Water Tanks, Construction, etc.
|
July 2, 2008
|
... 5/8" Hydrant Meter Deposit
|
$200 Refundable
|
All Water Charged at the Current Rate in Addition to Deposit
|
July 2, 2008
|
... 2" Hydrant Meter Deposit
|
$600 Refundable
|
All Water Charged at the Current Rate in Addition to Deposit
|
July 2, 2008
|
... Minimum Charge 5/8" Meter
|
$50
|
All Water Charged at the Current Rate in Addition to Deposit
|
July 2, 2008
|
... Minimum Charge 2" Meter
|
$100
|
All Water Charged at the Current Rate in Addition to Deposit
|
July 2, 2008
|
... Opening/ Closing Hydrant (after hours)
|
$150
|
All Water Charged at the Current Rate in Addition to Deposit
|
January 1, 2023 |
Legal/ Water Main Agreements - Water Main
|
$300
|
Legal Documents Required to be Completed by Town
|
July 3, 2008
|
... All Other Legal Documents
|
$75
|
Legal Documents Required to be Completed by Town
|
July 3, 2008
|
Turn Ons/Turn Offs - Fee
|
$75 Per Service Call
|
Regular Working Hours
|
January 1, 2023 |
Turn Ons/Turn Offs - Fee
|
$150 Per Service Call
|
After Hours
|
January 1, 2023 |
Watermain Extension
|
$600 Per Connection
|
To Connect at Any Water Main Installation
|
July 3, 2008
|
Watermain Extension Agreements
|
$300 plus
|
The Cost of Recording at the BCRD
|
July 3, 2008
|
Cross Connections
|
See Below
|
|
July 3, 2008
|
... Backflow Device Test
|
$10 Plus Cost of Test
|
|
January 1, 2023 |
... Backflow Device re-test
|
$65 Per Device
|
|
January 1, 2023 |
... Device Plan Approval
|
$125 Per Device
|
Includes Initial Test
|
January 1, 2023 |
... Facility Survey
|
$110 Per Hour
|
One Hour Minimum
|
January 1, 2023 |
Water Demand Charge
|
$10
|
|
November 25, 2019
|