Little Pond Sewer Service Area (LPSSA) Project
Project Background
The goal of the Little Pond Sewer Service Area project was to improve water quality in Little Pond. The project included connection of approximately 1,350 properties on the Maravista peninsula and the eastern portion of Falmouth Heights and on Teaticket Highway to the existing Town sewer system. Approximately 16 miles of sewer pipe (gravity main, low pressure main, and force main) were installed, and 2 new sewer lift stations were constructed, one at the end of Alphonse Street and one on Spring Bars Road.Three other related projects were also completed:
- Upgrades to the Main Wastewater Treatment Plant at 154 Blacksmith Shop Road
- Construction of 2 new treated wastewater recharge beds at the Town's Main Wastewater Treatment Plant
- Upgrades at the 3 existing wastewater lift stations affected by the Little Pond Sewer Service Area flow
Additional Information
- Information on the Combined Permit Process
- Information on Grinder Pumps
- LPSSA Final Betterment Assessment Memo 2017
- Betterment Hearing Presentation 2015
- Betterment Policy 2015
Tax Credit Information
- A Verification Letter (PDF) was mailed to all LPSSA Property owners in late October 2016, for use in applying for a Title V Tax Credit, if applicable.
- This Memo (PDF) provides some information about the letter and the Tax Credit; however, this is for general information only. Please Consult a Tax Advisor for individual applicability
Past Public
Information Meetings- A public / property owner LPSSA project information meeting was held Wednesday May 3rd 2017 at 7:00 pm at the Morse Pond School, 323 Jones Road.
- A public information meeting was held at Falmouth High School on Tuesday July 12th at 7 p.m. Review the Wastewater Superintendent's presentation (PDF) at that meeting.
- The Falmouth Heights-Maravista Neighborhood Association organized an Information EXPO which occurred before the Town's Information Meeting from 4-7 p.m. A link to the full FCTV recording of the evening's presentations and a summary of the Info Session and Expo are found on the Falmouth Heights-Maravista Neighborhood Association Website.
- An additional public (property owner) information meeting will be held Wednesday May 3rd 2017 at 7:00 pm at the Morse Pond School, 323 Jones Road in Falmouth.
-
Paving Maravista Ave at Priscilla St 4-11-17
-
Paving Maravista Ave 4-11-17
-
Paving Stowers St 4-5-16
-
Installing Stormwater Catch Basin Maravista Avenue - October 26, 2016
-
Residential Grinder Pump Unit Being Installed in Falmouth Heights - October 26, 2016
-
Testing New Alphonse Street Lift Station With Water - October 26, 2016